Welcoming, assisting, coordinating, optimising: our daily work at the service of ships and those who repair them.
Reception and dry docking
Our team welcomes ships of up to 115m, thanks to 4 dry docking facilities depending on the ship (a dry dock, a 400t strap lift, a 2000t boat lift, a 130m dry dock), with full support: attaching, towing, diving, coordination with the harbour master’s office and pilotage services.
The teams at Carenco, operator of the Port of Concarneau – CRN, make it a point of honour to provide rapid, reactive assistance to keep vessel immobilisation to a minimum.
- <24h for the slipway (boats up to 2.1m draught and 18t),
- <24h for the strap lift (boats up to 400t),
- 3 days for the lift.
At the Port of Concarneau – CRN, we can also handle your catamaran with our 11.5m wide and 42m long strap lift – a rare capacity in Brittany.
A network of skills
The Port of Concarneau – CRN, a port of the Brittany Region, works in constant liaison with the companies in the port area to guarantee perfect project management during technical stoppages.
Consult the directory of IPC members, which includes some of the port’s professionals.
If you have any further questions, Carenco will be happy to direct you to the right people.
Optimised management of port space
Carenco, operator of the Port of Concarneau, Construction et Réparation Navales, ensures that the quays and open spaces are fully occupied, that the AOTs are properly managed, and actively supports the local economic fabric.
At Concarneau, we place quality of service and sustainable commitments at the heart of our mission.
To request a quote, please contact us at contact@concarneau.port.bzh