Two maintenance operations on the 2 high voltage substations of the Shipbuilding and Repair concession have been scheduled for September:
Friday 23 September from 13:00 to 17:00 in the ship repair area;
Friday 30 September from 1pm to 5pm in the dry dock. Please note that this station cuts the power supply to the dock AND to the Left Bank cabinets.
We would like to draw your attention to the fact that these maintenance operations will require the substations concerned to be shut down for the duration of the work. All electrical installations and equipment on the CARENCO network will not be powered during this period, including access to the Roudouic slipway.
We apologize for the inconvenience caused, which is necessary for the proper functioning of the equipment.