For several days now, the gateway to the dry dock at the Port of Concarneau, Construction et Réparation Navales, has been open, allowing port users, pedestrians and cyclists to cross the dock in complete safety. The passageway will be upgraded with the opening of a...
One of the major projects at the Port of Concarneau – Shipbuilding and Ship Repair centre was completed on Thursday 17th October 2024, after several months of work. In 2002, the Port of Concarneau – Shipbuilding and Ship Repair centre built a dry dock 130m...
After taking you behind the scenes of the Dockmaster and QSE Officer jobs, Carenco, operator of the Port of Concarneau, Construction et Réparation Navales, gives the floor to Pierre Le Hecho, Maintenance Manager. Pierre, a worker at the Port of Concarneau, CRN for 12...
For more than 10 years, Carenco has been considering renovating the dry dock door at the Port of Concarneau. It is this year that this tool will be replaced thanks to the construction and installation of a new door, prefabricated at the Aire de Réparation Navales...