After taking you behind the scenes of the Dockmaster and QSE Officer jobs, Carenco, operator of the Port of Concarneau, Construction et Réparation Navales, gives the floor to Pierre Le Hecho, Maintenance Manager. Pierre, a worker at the Port of Concarneau, CRN for 12...
For more than 10 years, Carenco has been considering renovating the dry dock door at the Port of Concarneau. It is this year that this tool will be replaced thanks to the construction and installation of a new door, prefabricated at the Aire de Réparation Navales...
In the Port of Concarneau, Construction et Réparation Navales, the cargo ship ANEMOS does not go unnoticed with its 53 metre high masts and 81 metre long green hull. This unusual vessel has not failed to attract the attention of those involved in the port and the...
The hull of TOWT’s first sailing-cargo ship arrived in Concarneau on Monday, August 28 to begin the next phase of its construction. Built at ATG (Piriou Group) in Romania, the hull is now in the hands of the Concarneau shipyard for the mast lift and the...